Utilities · Priority 1

Water, pump & energy monitoring

A proposed telemetry and reporting package for flow, level, pressure, pump status and energy consumption.

Discuss this module →
Development / pilot scope. Features below are proposed options, not a claim of a certified or production-validated product. Availability and delivery depend on an agreed scope.

Proposed module scope

  • Flow and level sensor integration with time-series history
  • Pump run hours, fault events and energy dashboards
  • Alarm acknowledgement, trend reports and maintenance records
  • SCADA / BMS / ICCC data exchange

Partner fit

Water EPC contractors, treatment-plant integrators, pump OEMs and facility operators

Acceptance before scale

What to demonstrate

Build a bench with a meter, level input and pump simulator. Demonstrate sensor faults, stale-data detection, local manual operation and reconciliation with source readings.

Configuration gates

Meter accuracy and calibration must follow the selected tender. Protective pump interlocks require local engineering and validation; cloud connectivity is not a safety interlock.

Related requirement evidence

IoT ultrasonic water-meter deployment
Post-bid — demand evidence

Used Water Sentinel: treatment-plant IoT monitoring
Historical notice — status unverified

Pump data loggers and cloud IoT monitoring
Past deadline — demand evidence

Build the acceptance and partner-readiness pack →

For OEMs, EPCs & system integrators

Have a tender clause or integration gap?

Share the RFP, BOQ, site count, interfaces, mandatory certificates and submission date. We can discuss a bounded development or pilot scope and identify the evidence needed for acceptance.

Discuss your requirement →

jedarcad@gmail.com